Start with the well.
Build the trajectory, hole sections, tubulars, fluid system and operating limits. Every calculation begins with inspectable context.
geometry → fluid → limitsA connected petroleum-engineering workspace for modeling the well, examining MPD performance and turning field evidence into an issued technical record.
Scroll through the sequence. The physical system, hydraulic model and evidence chain build around one well.
Build the trajectory, hole sections, tubulars, fluid system and operating limits. Every calculation begins with inspectable context.
geometry → fluid → limitsThe BOP stack anchors the barrier envelope. The RCD completes the closed-loop returns path while allowing drillstring movement.
BOP + RCD → closed annulusFive modeled choke paths and the surface returns network make pressure response visible. The MGS is shown on its designated process route—not as a routine shortcut.
RCD → chokes → process systemUse well geometry, rheology, flow and surface backpressure to examine BHP, ECD, ESD, losses and operating-window behavior.
physics first · assumptions visibleConnect DOR, KPI, PWD and HMI evidence to events, performance plots and client-ready exports—with the engineer approving the final record.
source → analysis → issued reportAI may help refine language or organize evidence when the engineer chooses it. The governing calculations, assumptions and source trail remain reviewable.
ECD = MW + ΔPann / (0.052 · TVD)Circulating densityRe = ρvD / μFlow regimeΔP = f · (L/D) · ρv² / 2Pressure lossFLOWIN − FLOWOUT → ΔVFlow balancePlan the well, challenge the scenario, explain the operation and preserve the technical record.
Connect sections, surveys, hole geometry, tubulars, fluids, BHA and scenarios in one inspectable model.
MODELAnalyze operating windows and MPD workflows with deterministic tools designed for engineering review.
ANALYZEImport DOR, KPI and supporting records, review plots and wording, then export the approved package.
REPORT
Every well teaches the next one.
Planning, execution, performance and closeout should remain connected. That makes every decision easier to examine and every final report reusable as engineering knowledge.
Private access · controlled workflows · source-traceable delivery